Boiler Installation

Boiler Installation

Lakeshore Mechanical Ltd (formerly Jyko) removed existing system and upgraded to a new High Efficiency Condensing

Boiler and Indirect Hot Water Tank. This system also runs 4 air handlers that manage

the heating & cooling needs in the building. The air handlers are strategically mounted

throughout the building. The boiler sits up above in the ceiling making this a challenging

job for Jyko. We also tied in the huge steel water pan that was custom fabricated for this

system and installed a water filter system to keep the water conditioned & PH balanced

in this closed loop system.

Another happy client.

Whistler Boiler